Posts tagged installation
Posts tagged installation
In the course of refurbishment works ART+COM was commissioned to create a signature art installation for the Departure-Check-in hall of Terminal 1 at Singapore Airport. “Kinetic Rain” is composed of two parts, each consisting of 608 rain droplets made of lightweight aluminum covered with copper. Suspended from thin steel ropes above the two opposing escalators, each droplet is moved precisely and seemingly floating by a computer-controlled motor hidden in the halls ceiling. The drops follow a 15-minute, computationally designed choreography where the two parts move together in unison, sometimes mirroring, sometimes complementing, and sometimes responding to each other.
(via swingingonthegallowspole)
(via buttart)

trees drawing….
(via vanishingage)
Arik Levy, ROCKGIANT (2011).
(Source: artruby)
Idea Lab Installation by bluarch architecture
Sebastien Preschoux - Color Theory, 2009
(Source: likeafieldmouse)
That summarizes summer in Georgia alright…
Yep.